Engineering >> Civil & Environmental EngineeringFill Needed for a Highway Exit Rampby Timothy Bayne
Submitted : Spring 2014 The purpose of this project is to determine the volume of fill and surface area of concrete required for an exit ramp on a highway. The values that were calculated for the results gave an insight to what is truly required when constructing a project of this scale. An idea of the amount of materials that are needed for the project can be obtained from the calculations.
|