Engineering >> Civil & Environmental EngineeringWater For Miramarby Gavin Zubka
Submitted : Fall 2013 I found the volume of concrete it takes to create an underground concrete cistern. I calculated the volume of three different pieces to the tank the basin, neck, cover. I then used the results to find out the cost in materials and compare it to another water storage option. I found that the concrete basin is not the best option. Related Links:
|